Contract 88200 REL 5: 2002-077-00 EXP CEERP SCIENCE SUPPORT
Project Number:
Title:
Estuary/Ocean Research, Monitoring and Evaluation (RM&E) Support
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia River Estuary Columbia Estuary 50.00%
Lower Columbia Columbia Lower 50.00%
Contract Number:
88200 REL 5
Contract Title:
2002-077-00 EXP CEERP SCIENCE SUPPORT
Contract Continuation:
Previous: Next:
95557: 2002-077-00 EXP CEERP SCIENCE SUPPORT
Contract Status:
Issued
Contract Description:
Technical Support for the Columbia Estuary Ecosystem Restoration Program
Account Type(s):
Expense
Contract Start Date:
11/01/2025
Contract End Date:
10/30/2026
Current Contract Value:
$500,200
Expenditures:
$112,855

* Expenditures data includes accruals and are based on data through 31-Jan-2026.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Order
Accrual category:
RM&E
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Project Administration 10/30/2026
Environmental Compliance Complete C: 165. Produce Environmental Compliance Documentation 10/30/2026
Coordination Activities D: 191. Watershed Coordination/CEERP 10/30/2026
R&M Plan Support E: 141. Other Reports for BPA 10/30/2026
Completed Progress (Annual) Report F: 132. Annual Report to BPA for the period (November, 2024) to (October, 2025) 03/31/2026
MML Document Review G: 122. Provide technical review 10/30/2026
Produce accessible, error-checked datasets H: 157. Restoration Design Challenges 10/30/2026
Deliverable: An accessible, error-checked data set with metadata I: 162. Restoration Design Challenges Data Analysis 10/30/2026

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Cutthroat Trout, Coastal (Oncorhynchus clarkii clarkii) - All Anadromous Populations
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Sockeye (Oncorhynchus nerka) - All Populations
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Project Administration
C 165 Produce Environmental Compliance Documentation
D 191 Watershed Coordination/CEERP
E 141 Other Reports for BPA 05/19/2025
F 132 Annual Report to BPA for the period (November, 2024) to (October, 2025)
G 122 Provide technical review
H 157 Restoration Design Challenges 05/19/2025
I 162 Restoration Design Challenges Data Analysis